Close Menu

    Subscribe to Updates

    Get the latest headlines from PapaLinc about news & entertainment.

    What's Hot

    Nazi tattooed Graham Platner’s behavior is turning voters OFF the Democratic Party

    Results: Joshua-Prenga Prelims

    Chairman Wontumi jailed for 20 years with hard labour

    Facebook X (Twitter) Instagram
    • Lifestyle
    • Africa News
    • International
    Facebook X (Twitter) Instagram YouTube WhatsApp
    PapaLincPapaLinc
    • News
      • Africa News
      • International
    • Entertainment
      • Lifestyle
      • Movies
      • Music
    • Politics
    • Sports
    Subscribe
    PapaLincPapaLinc
    You are at:Home»Politics»Traffic changes announced at Tetteh Quarshie Interchange for four months
    Politics

    Traffic changes announced at Tetteh Quarshie Interchange for four months

    Papa LincBy Papa LincMarch 9, 2026No Comments2 Mins Read1 Views
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit
    Traffic changes announced at Tetteh Quarshie Interchange for four months
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


    The Ghana Highway Authority has announced a temporary traffic management arrangement on sections of the Accra Tema Motorway and the Tetteh Quarshie Interchange as construction work continues on the motorway expansion project.

    In a public announcement issued on March 5, the Authority explained that the arrangement forms part of ongoing construction works under the Accra Tema Motorway and Extension Projects.

    It noted that the traffic adjustment is required to allow contractors carry out T beam launching works for the expansion of the Tetteh Quarshie Interchange Bridge on the N1 highway.

    Under the arrangement, lanes on the N4 northbound carriageway, which serves traffic moving from Accra to Madina, will be temporarily closed.

    Meanwhile, the southbound carriageway from Madina to Accra, which currently has four lanes, will be reconfigured into two lanes in each direction to accommodate traffic moving both ways.

    The Authority indicated that the temporary traffic changes will take effect from Monday, March 9, 2026 and are expected to last for four months.

    According to the statement, the lane reduction is necessary to create a safe working space for construction personnel and to ensure the safety of motorists using the road.

    The Authority therefore advised drivers to be cautious, obey traffic signs and cooperate with traffic management officials throughout the construction period.

    It encouraged members of the public who require further information to contact its Public Affairs Division through WhatsApp on 0551622244.

    By: Jacob Aggrey



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email
    Previous ArticleBlack Maidens coach announce preliminary squad for U17 world cup qualifiers
    Next Article Revealed: Brit husband of Florida woman who shot her two children dead then killed herself is the brother of Sky Sports presenter Polly James
    Papa Linc

    Related Posts

    Defending champion Johnson-Thompson withdraws from Commonwealth Games

    July 25, 2026

    Arsenal sign Greece forward Tzolis for £34m

    July 25, 2026

    Adeyemi joins Barcelona – Ghanaian Times

    July 25, 2026
    Ads
    Top Posts

    Secret code break that ‘solved’ the Zodiac killer case: Expert who unmasked single suspect behind two of America’s darkest murders tells all on bombshell investigation

    December 24, 2025141 Views

    Tech entrepreneur uses ChatGPT to create a personalised cancer vaccine for his DOG – and the breakthrough could soon help humans too

    March 14, 2026123 Views

    Newsreader Sandy Gall personally lobbied Margaret Thatcher’s government to back the Mujahideen

    July 4, 2025105 Views

    Meet the ISIS brides arriving in Australia TODAY – as Anthony Albanese tries to have it both ways

    May 7, 202675 Views
    Don't Miss
    International July 25, 2026

    Nazi tattooed Graham Platner’s behavior is turning voters OFF the Democratic Party

    One chaotic race for the US Senate could cost the Democrats the upper hand in…

    Results: Joshua-Prenga Prelims

    Chairman Wontumi jailed for 20 years with hard labour

    Britain’s first bubble baby is all grown-up: Boy born without immune system returns to thank Great Ormond Street doctors who saved his life 25 years ago

    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • WhatsApp

    Subscribe to Updates

    Get the latest headlines from PapaLinc about news & entertainment.

    Ads
    About Us
    About Us

    Your authentic source for news and entertainment.
    We're accepting new partnerships right now.

    Email Us: info@papalinc.com
    For Ads on our website and social handles.
    Email Us: ads@papalinc.com
    Contact: +1-718-924-6727

    Facebook X (Twitter) Pinterest YouTube WhatsApp
    Our Picks

    Nazi tattooed Graham Platner’s behavior is turning voters OFF the Democratic Party

    Results: Joshua-Prenga Prelims

    Chairman Wontumi jailed for 20 years with hard labour

    Most Popular

    “Dad can’t wait to marry you off” – Bride’s father eagerly approves the couple’s union with a swift ‘Yes’ answer on their wedding day (WATCH)

    November 21, 20240 Views

    Ring camera captures young couple calmly coming and going after killing ‘grandfather’

    November 21, 20240 Views

    Alan Kyerematen says the NPP is a declining party and advises Ghanaians to look beyond it.

    November 23, 20240 Views
    © 2026 PapaLinc. Designed by LiveTechOn LLC.
    • News
      • Africa News
      • International
    • Entertainment
      • Lifestyle
      • Movies
      • Music
    • Politics
    • Sports

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.