Close Menu

    Subscribe to Updates

    Get the latest headlines from PapaLinc about news & entertainment.

    What's Hot

    Access Restricted

    ‘We don’t care too much about Ghana’ – Croatia coach Zlatko Dalic

    Michael Nichols confirmed as host for Afrofuture 2025

    Facebook X (Twitter) Instagram
    • Lifestyle
    • Africa News
    • International
    Facebook X (Twitter) Instagram YouTube WhatsApp
    PapaLincPapaLinc
    • News
      • Africa News
      • International
    • Entertainment
      • Lifestyle
      • Movies
      • Music
    • Politics
    • Sports
    Subscribe
    PapaLincPapaLinc
    You are at:Home»Politics»Work begins on $53m Eastern corridor road project
    Politics

    Work begins on $53m Eastern corridor road project

    Papa LincBy Papa LincJuly 16, 2025No Comments2 Mins Read2 Views
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit
    Work begins on m Eastern corridor road project
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


     Reconstruction works have started on the Tudor Adi­dome-Asikuma Junction road in the Volta Region as part of the Eastern Corridor Devel­opment Project Programme, Phase 1 being funded by the African Development Bank and OPEC Fund for International Development at a total cost of $53.619.394.88.

    The 63.1-kilometre road, expected to be completed in 24 months, has been awarded to  Messrs China Jiangxi Internation­al Eco & Tech. Coop.Co.Ltd.

    Mr Krakraba (Right) briefing the Minister and his team (left) (Extreme Rigt) Contractors working on one of the storm drains

    This came to light when the Minister of Roads and Highways, Kwame Governs Agbodza, paid a working visit to the construction site in Asikuma yesterday.

    The three-component project involves the construction of 39 39-kilometre single-carriage Double Surfacing Bituminous road from Dofor Adidome to Asikuma Junction road.

    Additionally, another 23.9 kilo­metres of 2-lane single-carriage bituminous road from Asutsuare to Aveyime, a bypass and an interchange at Asikuma Junction with slip roads.

    The visit allowed the Minister to get a first–hand information on the progress of work and challenges confronting the con­tractor and charting a new way forward.

    The Resident Engineer to the project, Ato Kakraba, briefing the Minister, said even though work was progressing steadily, more support would be needed in terms of honouring certificates, which are outstanding.

    They have started with the foundations of some of the in­terchanges, while earthworks are also progressing steadily.

    The Resident Engineer, how­ever, appealed to the Minister to help in addressing issues of compensation to affected proper­ty owners in order not to unduly delay the project.

    Mr Kakraba also bemoaned the demand for loading fees by the North Tongu and Adansi West District Assemblies and pleaded with the Minister to intervene.

    He commended the contractor for being on site and working despite the challenges

     FROM LAWRENCE VOMA­FA AKPALU, ADIDOME  



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email
    Previous ArticleGoaso Astroturf cost government GH¢4.2m, Mim facility privately funded – Kofi Adams
    Next Article Schoolboy prankster, 15, told police ‘it’s not that deep’ after throwing 15kg seat from third floor of Westfield shopping centre
    Papa Linc

    Related Posts

    Committee on Defence and Interior Considers Ministry Of Interior And its Agencies 2026 Budget Estimates

    December 5, 2025

    Majority Leader Calls For Abolishment of the OSP

    December 5, 2025

    Police rescues victim and arrest suspect in viral domestic abuse video

    December 5, 2025
    Ads
    Top Posts

    Here’s why Ghana Airways collapsed in 2004

    November 5, 202452 Views

    A Plus questions the hypocrisy of NPP members who remained silent about corruption for 8 years, only to speak out after losing power.

    December 26, 202450 Views

    Miracle of ‘the 33’ that gripped the world: How dozens somehow survived 69 days of hell trapped 2,300ft down in Chilean gold mine… and the bizarre love-triangle that raged on the surface

    October 11, 202546 Views

    Urgent search continues for Paul Barning after he was attacked by shark during fishing competition

    February 23, 202545 Views
    Don't Miss
    International December 6, 2025

    Access Restricted

    Access Restricted Associated Newspapers Ltd Access Restricted Thank you for your interest. Unauthorised access is…

    ‘We don’t care too much about Ghana’ – Croatia coach Zlatko Dalic

    Michael Nichols confirmed as host for Afrofuture 2025

    Stop using social media to create panic or face the law

    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • WhatsApp

    Subscribe to Updates

    Get the latest headlines from PapaLinc about news & entertainment.

    Ads
    About Us
    About Us

    Your authentic source for news and entertainment.
    We're accepting new partnerships right now.

    Email Us: info@papalinc.com
    For Ads on our website and social handles.
    Email Us: ads@papalinc.com
    Contact: +1-718-924-6727

    Facebook X (Twitter) Pinterest YouTube WhatsApp
    Our Picks

    Access Restricted

    ‘We don’t care too much about Ghana’ – Croatia coach Zlatko Dalic

    Michael Nichols confirmed as host for Afrofuture 2025

    Most Popular

    Whereas Black Stars had been shedding to Sudan, Kurt Okraku was promoting gamers in Germany

    October 17, 20240 Views

    The $500 billion magnificence trade’s ‘inexperienced’ ambitions are a patchwork at finest. They usually’re falling quick

    October 17, 20240 Views

    Grace Ashly on how she ‘spiritually’ energised her cheer songs for the Black Stars

    October 17, 20240 Views
    © 2025 PapaLinc. Designed by LiveTechOn LLC.
    • News
      • Africa News
      • International
    • Entertainment
      • Lifestyle
      • Movies
      • Music
    • Politics
    • Sports

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.