Close Menu

    Subscribe to Updates

    Get the latest headlines from PapaLinc about news & entertainment.

    What's Hot

    “King of the Jungle ” – Lady shares her Fiancé’s hilarious response to the pictures she sent him (WATCH)

    What does 8647 mean? The disturbing Trump assassination movement as MAGA calls for FBI director’s arrest

    Fraser-Pryce admits family balance hard to maintain

    Facebook X (Twitter) Instagram
    • Lifestyle
    • Africa News
    • International
    Facebook X (Twitter) Instagram YouTube WhatsApp
    PapaLincPapaLinc
    • News
      • Africa News
      • International
    • Entertainment
      • Lifestyle
      • Movies
      • Music
    • Politics
    • Sports
    Subscribe
    PapaLincPapaLinc
    You are at:Home»Politics»Disregard reports of closure of main Apremdo Bridge -Contractor
    Politics

    Disregard reports of closure of main Apremdo Bridge -Contractor

    Papa LincBy Papa LincFebruary 25, 2025No Comments3 Mins Read0 Views
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Reddit
    Disregard reports of closure of main Apremdo Bridge -Contractor
    Share
    Facebook Twitter LinkedIn Pinterest WhatsApp Email


     Justmoh Construc­tion Limited has advised commuters using the Takoradi-Agona Nkwanta road in the Western Region to disregard assertions r egarding the closure of the main Apremdo Bridge.

    The company clarified that there are no intentions to close the bridge, as construction is proceeding as planned to ensure uninterrupted traffic flow for the travelling public.

    The Project Manager, Justmoh Construction, Johan Prinsloo, gave the assurance to journalists at the Apremdo project site on Friday, following media publica­tions that the bridge was closed.

    “There is no intention of clo­sure of the Apremdo Bridge. We are working on the first concrete bridge as part of the project, which is almost finished. Then, we’ll put all the traffic on the bridge and dismantle the old steel bridge in order for us to build a new bridge at that same location, as the old steel bridge. So, we are not blocking the traffic. We are not going to cause any delays,” he explained.

    He stated that at the Apremdo site, the old steel bridge would be replaced with two concrete bridges, one serving the traffic from Takoradi- Agona stretch, and another from Agona towards Takoradi.

    Mr Prinsloo informed jour­nalists that there had been some traffic delays previously due to ongoing asphalt work from the Agona Nkwanta end to PTC.

    He, however, stated that since last week, Justmoh Construction had cleared the way for traffic in both directions from PTC to Apremdo, resulting in the elimi­nation of congestion along that segment.

    “As you can see, from the PTC roundabout all the way up to the first bridge at Apremdo, we have a dual carriageway, so there are two lanes coming in and coming up so we don’t have any traffic conges­tion problems at the moment,” he mentioned.

    On complaints on dusty situation, the project manager assured the public and residents at the projects sites that contractor had been watering the road in accordance with road regulations, but explained that, unfavourable conditions like hot temperatures had been a challenge.

    He said work was about 50 per cent complete and was on schedule.

    “We assure the public there’s no more traffic from PTC to Apremdo Bridge.

    The public should also under­stand and bear with us that we are building the road for the public, and construction is not always easy, but we are always trying our best to make sure that we don’t cause any unnecessary delays,” he elaborated.

    The General Manager, Justmoh Construction, Stephen Ham­mond, said it was difficult for the contractor to create an easy by -pass especially at the Apremdo main bridge area, adding “that’s one worrying challenge.”

    He stated that the challenge was to create a by-pass from the Second Infantry Brigade (2BN) end for traffic to redirect onto the main road at Apremdo to PTC interchange and Paa Grant.

    “Unfortunately, there’s no easy bypass. But, we have now opened the road from PTC to the Apremdo Bridge and so far we have eased the congestion at that section of the project. We have not closed the bridge. We will by March complete the first con­crete bridge and load the traffic from the old steel bridge for traffic flow. Work is about 90 per cent completed,” Mr Hammond added.

    He expressed concern that the impatience exhibited by drivers in the vicinity of the narrow Apremdo Bridge significantly contributed to congestion and inconvenience for commuters.

    The General Manager also con­firmed that the asphalting work at Ankyernyi was progressing well, which would facilitate road access and alleviate congestion, stating, “We are on track, adhering to our schedule.”

    FROM CELEMENT ADZEIBOYE, APREMDO J



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Reddit WhatsApp Telegram Email
    Previous ArticleI received $5,000 from Saudi Arabian king after naming my club after him – Alhaji Grusah
    Next Article Overseas students will have to find a graduate level job within two years or risk deportation under government plans to tackle soaring migrant numbers
    Papa Linc

    Related Posts

    Fraser-Pryce admits family balance hard to maintain

    May 16, 2025

    Man City, PSG to face no action over alleged breaches of EU competition law

    May 16, 2025

    Amorim urges Man Utd to focus on Chelsea, not Europa League final

    May 16, 2025
    Ads
    Top Posts

    A Plus questions the hypocrisy of NPP members who remained silent about corruption for 8 years, only to speak out after losing power.

    December 26, 202443 Views

    Here’s why Ghana Airways collapsed in 2004

    November 5, 202439 Views

    Urgent search continues for Paul Barning after he was attacked by shark during fishing competition

    February 23, 202537 Views

    Kenyan Senator breaks silence on her alleged intimate affairs, secret child with John Agyekum Kufuor

    December 21, 202432 Views
    Don't Miss
    Africa News May 16, 2025

    “King of the Jungle ” – Lady shares her Fiancé’s hilarious response to the pictures she sent him (WATCH)

    A Nigerian lady married shares the moment she sent her fiancé traditional fabrics to select…

    What does 8647 mean? The disturbing Trump assassination movement as MAGA calls for FBI director’s arrest

    Fraser-Pryce admits family balance hard to maintain

    Lamine Yamal is the best player in the world – Cole Palmer declares

    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • WhatsApp

    Subscribe to Updates

    Get the latest headlines from PapaLinc about news & entertainment.

    Ads
    About Us
    About Us

    Your authentic source for news and entertainment.
    We're accepting new partnerships right now.

    Email Us: info@papalinc.com
    For Ads on our website and social handles.
    Email Us: ads@papalinc.com
    Contact: +1-718-924-6727

    Facebook X (Twitter) Pinterest YouTube WhatsApp
    Our Picks

    “King of the Jungle ” – Lady shares her Fiancé’s hilarious response to the pictures she sent him (WATCH)

    What does 8647 mean? The disturbing Trump assassination movement as MAGA calls for FBI director’s arrest

    Fraser-Pryce admits family balance hard to maintain

    Most Popular

    Aside from Dodowa, title one hospital began and accomplished below Mahama

    October 17, 20240 Views

    April 3, 2023 – Russia-Ukraine information

    October 17, 20240 Views

    Ghana’s crude oil manufacturing dips

    October 17, 20240 Views
    © 2025 PapaLinc. Designed by LiveTechOn LLC.
    • News
      • Africa News
      • International
    • Entertainment
      • Lifestyle
      • Movies
      • Music
    • Politics
    • Sports

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.